Project
Details

Applications:

OVERVIEW

Teviot Row House, the world’s oldest purpose-built student union, reopened in March 2026 following a two and-a-half-year refurbishment that set out to do something genuinely difficult: bring a Victorian landmark fully up to modern standards without disturbing the character that has made it one of Edinburgh’s most loved buildings for over 130 years.

The project demanded that every intervention – from structural repairs to electrical upgrades – respect the building’s layers of history. Favourite spaces including the Library Bar and Debating Hall were carefully restored, with heritage features retained or reinstated where needed. The result is an interior of considerable variety: richly detailed Victorian public rooms sit alongside more contemporary spaces, each with its own material palette and atmosphere.

Emergency lighting in a building of this complexity cannot be treated as a single, standard specification. Different spaces demanded different solutions and that is precisely where Philip Payne’s portfolio proved its value.

THE SOLUTION

Working across a listed building with multiple distinct interior environments, the project team required emergency exit lighting and signage that could adapt to each setting without defaulting to a generic solution. The warm, dark-toned timbers and ornate detailing of the historic rooms called for finishes with depth and warmth. Lighter, more contemporary spaces required a different approach entirely. A single product in a single finish would have been a compromise in every room. Working with Philip Payne enabled the project team to develop a coordinated specification across the building, selecting fittings and finishes that responded to each environment on its own terms.

OUTCOME

The completed installation demonstrates what becomes possible when emergency lighting and signage is treated as part of the design process rather than a post-specification addition.

Across a building of exceptional heritage significance, Philip Payne’s range of finishes and products allowed the project team to achieve full compliance without visual compromise in any space.

With Specto-XT providing automated testing and remote oversight, the building’s operators benefit from continuous compliance confidence, without the disruption of manual checks in spaces where access and atmosphere must be carefully preserved.

Manufactured in Britain and specified to order, the Teviot Row House project reflects Philip Payne’s core purpose: safety that earns its place in the architecture around it.